Create OHSA-compliant electrical method statements for South African tenders. Covers Cable installation and termination, Distribution board installation, Lighting installation, and more.

2-Minute Generation

AI generates your complete electrical method statement in under 2 minutes.

OHSA Compliant

Meets Construction Regulations 2014 and SANS 10142-1 (Wiring of premises) requirements.

Export Ready

Download as PDF or Word. Ready for tender submission.

What's Included in a Electrical Method Statement

Standard Sections

  • Scope of Electrical Works
  • Sequence of Operations
  • Isolation Procedures
  • Lock-out/Tag-out Protocols
  • Testing & Commissioning
  • Quality Control Measures
  • Emergency Procedures

Common Activities Covered

  • Cable installation and termination
  • Distribution board installation
  • Lighting installation
  • Power socket installation
  • Earthing and bonding
  • Testing and commissioning
  • Fault finding and repairs
  • Generator installation

Electrical Hazards & Safety Requirements

Common Hazards

  • •Electric shock
  • •Arc flash
  • •Burns from hot equipment
  • •Falls from height (working on elevated installations)
  • •Fire from faulty wiring
  • •Explosion in hazardous areas
  • •Musculoskeletal injuries from cable pulling

Required PPE

  • •Insulated gloves (Class 00-4)
  • •Safety boots with insulated soles
  • •Hard hat
  • •Safety glasses
  • •Arc flash suit (where applicable)
  • •High-visibility vest

Applicable Regulations & Standards

SANS 10142-1 (Wiring of premises)
OHSA Construction Regulations 2014
Electrical Installation Regulations
SANS 10142-2 (Low voltage installations)

CIDB Classes applicable: EP, EB

Electrical Method Statements in South Africa

Electrical work on South African construction sites is governed by the Electrical Installation Regulations (EIR) under the OHSA and SANS 10142 series. Every installation must be signed off by a registered electrician and accompanied by a Certificate of Compliance (CoC). Contractors bidding on government tenders must demonstrate competence in isolation procedures, live-work protocols, and arc flash protection. CIDB classes EP and EB cover electrical engineering works, and grading determines the maximum contract value your firm can take on. Common tender requirements include a detailed method statement, a hazard identification and risk assessment (HIRA) specific to electrical work, and proof that all personnel hold valid wireman's licences.

Method Statement Writing Tips for Electrical

Tip 1: Always start with a detailed isolation procedure — assessors look for Lock-Out/Tag-Out (LOTO) protocols specific to each circuit and panel

Tip 2: Include cable schedule references and show conductor sizing calculations comply with SANS 10142-1 Table 10.1

Tip 3: Spell out your testing sequence: insulation resistance → earth continuity → polarity → RCD trip time — assessors want to see the order

Tip 4: Reference your CoC issuance process and name the registered person who signs off

Tip 5: For DB installations, include a single-line diagram reference and show how you verify protective device coordination

Common Mistakes in Electrical Method Statements

✗

Submitting a generic method statement that doesn't mention SANS 10142 or EIR — immediate red flag for assessors

✗

Failing to include wireman's licence numbers for each electrician listed on the project

✗

Not specifying arc flash PPE category per panel — required for HIRA compliance

✗

Using old colour codes (red/black) in documentation when SANS 10142-1:2017 requires brown/blue

✗

Omitting the CoC process — without this, the installation cannot be legally energised

Key Legislation for Electrical Method Statements

Regulation / StandardRequirement
SANS 10142-1:2017Wiring of premises — sets rules for conductor sizing, protection, earthing, testing, and CoC requirements. Updated 2017 to align with IEC colour codes.
Electrical Installation Regulations (EIR)Under OHSA — requires all installations to be done by registered persons, inspected, and certified with a CoC before energisation.
OHSA Construction Regulations 2014, Reg 24Electrical installations on construction sites must be inspected weekly by a competent person. Temporary supplies need earth leakage protection.
SANS 10142-2Low-voltage installations exceeding 100A — additional requirements for industrial and commercial installations common in government tenders.

Electrical Method Statement FAQ

Do I need a CoC for construction-phase temporary electrical installations?
Yes. The Electrical Installation Regulations require a CoC for any fixed installation, including temporary site power. A registered electrician must sign off before the supply is energised.
What CIDB grading do I need for electrical tender work?
Electrical works fall under CIDB classes EP (Electrical Engineering: Infrastructure) and EB (Electrical Engineering: Building). Your grading level (1-9) determines the maximum single contract value you can tender for.
Is arc flash PPE mandatory for all electrical work?
You must do an arc flash risk assessment per SANS 724. PPE category depends on calculated incident energy. For most distribution board work, Category 2 (8 cal/cm²) arc-rated clothing is the minimum.
How long is a wireman's licence valid?
Wireman's licences issued by the Department of Employment and Labour do not expire but must be carried on site at all times. The employing contractor must verify licences before assigning work.